The final stage of the design is ready.

As a partner of Herkal Ltd, we were assigned to complete the final stage of the design project and prepare the documentation required for fabrication and erection of the structure.

The task included steel joints design calculations, creating 3D BIM Model and preparing single, assembly and general arrangement drawings for the steel structure. Also, the steel contractor have received CNC files for direct machine control through data exchange.

Although the relatively small sizes of the structures some interesting and complex details were prepared to guarantee that each premise which has been taken into account during the previous stage of structural analysis is kept and the steel members work exactly as it was suggested in the basic design project.

We stay available for our partner and wish him very recent finish of the execution project phase.